Completed

TRA Simiyu Regional Office Building

Construction of the Tanzania Revenue Authority Simiyu Regional Office Building — a new multi-storey headquarters delivered on time and within budget, with a zero-accident safety record.

Simiyu, Tanzania January 2023 – December 2024 Commercial

TZS 0BContract Value
0Months to Handover
0+Locals Engaged
0Accidents Recorded

Project quick facts

Client
Tanzania Revenue Authority
Location
Simiyu, Tanzania
Contract Value
TZS 9.9 Billion
Timeline
Jan 2023 – Dec 2024
Sector
Commercial
Status
Completed
The completed TRA Simiyu Regional Office Building seen from above

Project Overview

A Permanent Base for Tax Administration in Simiyu

Pioneer Builders Limited was entrusted with the execution of the Construction of the Tanzania Revenue Authority (TRA) Simiyu Regional Office Building. The project forms part of the Government's ongoing efforts to decentralise and strengthen tax administration infrastructure across the country.

The office serves as TRA's permanent base in the Simiyu Region, providing modern facilities for improved service delivery, compliance monitoring and administrative operations.

The main objective was to deliver a high-quality, cost-effective and durable office building that meets TRA's operational and functional requirements, while adhering to national standards and environmental considerations.

  • On TimeHanded over within the contract programme.
  • Within BudgetDelivered against the agreed contract sum.
  • Zero AccidentsNo accidents across the project lifecycle.
  • Local LabourOver 60 local technicians and engineers.

By the Numbers

Project Highlights

Every figure below is taken from the executed contract record for the TRA Simiyu project.

TZS 0B

Contract Value

Lump-sum contract for the complete new-build regional office.

0%

Completion

Delivered on time and within budget, with all works handed over.

0+

Local Workforce

Local technicians and engineers whose employment the project supported.

0

Safety Record

Zero accidents reported during the entire project lifecycle.

0

Months on Site

From mobilisation in January 2023 through to handover in December 2024.

0

Storeys

A multi-storey reinforced concrete office building with a domed central atrium.

Clearing, excavation and levelling of the site, followed by setting out and the full foundation works.

  • Clearing
  • Excavation
  • Levelling
  • Setting out
  • Foundations

Construction of a multi-storey reinforced concrete office building, including the domed central atrium that gives the building its identity.

  • Reinforced concrete frame
  • Multi-storey
  • Roofing
  • Partitioning

Floor and wall finishes, ceilings and painting throughout, together with aluminium and glass fittings, doors and windows.

  • Floor finishes
  • Wall finishes
  • Ceilings
  • Painting
  • Aluminium & glass
  • Doors & windows

Electrical wiring and lighting systems throughout the building, backed by a dedicated generator house.

  • Electrical wiring
  • Lighting systems
  • Generator house

Air conditioning and ventilation systems, plus water supply, plumbing and drainage with dedicated water storage facilities.

  • Air conditioning
  • Ventilation
  • Water supply
  • Plumbing
  • Drainage
  • Water storage

Structured cabling for data and communication, fire detection and protection systems, CCTV and access control.

  • Structured cabling
  • Fire detection
  • Fire protection
  • CCTV
  • Access control

Access roads, parking spaces, landscaping and the boundary wall completing the secured compound.

  • Access roads
  • Parking
  • Landscaping
  • Boundary wall

Adherence to health and safety standards, environmental and social safeguards, and regular inspections and reporting in collaboration with TRA and the consultants.

  • Health & safety
  • Environmental safeguards
  • Social safeguards
  • Regular inspections
  • Joint reporting

Delivery Programme

How the Project Was Delivered

Twenty-four months from a cleared site to a commissioned regional headquarters.

  1. January 2023 · Phase 01

    Mobilisation & Site Preparation

    Site establishment, clearing, excavation and levelling of the greenfield site, followed by setting out to the consultant's coordinates.

    Completed
  2. Phase 02

    Foundations & Substructure

    Full foundation works forming the base for the multi-storey reinforced concrete structure.

    Completed
  3. Phase 03

    Superstructure Construction

    The reinforced concrete frame rising storey by storey, including the curved façade and domed central atrium.

    Completed
  4. Phase 04

    Roofing & Services Installation

    Roofing and partitioning, then electrical wiring, air conditioning, plumbing, structured cabling, fire protection, CCTV and access control.

    Completed
  5. Phase 05

    Finishes & External Works

    Floor and wall finishes, ceilings, painting, aluminium and glass fittings; access roads, parking, landscaping and the boundary wall.

    Completed
  6. December 2024 · Phase 06

    Commissioning & Handover

    Systems testing, final joint inspection with TRA and the consultants, and handover of the completed regional office.

    Completed

Our Standards

Safety, Quality & Sustainability

How the works were governed on site — and why the project closed with a clean safety record.

Zero-Accident Record

No accidents were reported at any point during the project lifecycle.

Health & Safety Standards

The works were executed in adherence to national health and safety standards throughout.

Environmental Safeguards

Environmental and social safeguards were applied across the site for the duration of the contract.

Inspection & Reporting

Regular inspections and reporting were carried out in collaboration with TRA and the appointed consultants.

Eco-Friendly Materials

Eco-friendly materials and energy-efficient systems were specified for long-term environmental benefit.

Durable Design

Durable design choices were made to ensure long-term environmental, social and economic benefits.

Beyond the Build

Project Impact

What the completed building delivers for TRA, for taxpayers and for the Simiyu regional economy.

Stronger Tax Infrastructure

Improved tax administration infrastructure gives the Simiyu Region a permanent, purpose-built TRA base.

Better Working Environment

Modern facilities give TRA staff a working environment suited to the responsibilities they carry.

Enhanced Taxpayer Experience

Improved accessibility to TRA services and a better experience for every taxpayer who visits.

Jobs Created

The project supported job creation for over 60 local technicians and engineers.

Local Economic Stimulation

Construction activity stimulated the local economy through employment and procurement.

Long-Term Sustainability

Eco-friendly materials, energy-efficient systems and durable design deliver lasting benefit.

Client testimonial

Pioneer Builders Limited delivered beyond expectations. Their professionalism, attention to detail, and commitment to quality ensured our project was a success. We are proud to have partnered with them.
Tanzania Revenue Authority Client · TRA Simiyu Regional Office

Let's Build Together

Need a Trusted Construction Partner?

From government institutions to residential developments, Pioneer Builders Limited delivers Class One construction across Tanzania — on programme, on budget and to specification.

Class One Registered Contractor · Registered Certificate No. 85237 · Call +255 715 637 537 or email info@pioneerbuilders.co.tz

Account details will be confirmed via email.